banner.jpg (8927 bytes)
Button Spacer
Button Spacer
Kit Review
Button Spacer
Step By Step
Button Spacer
Extras
Button Spacer
Gallery
Button Spacer
Links
Button Spacer
  Last Update: 26 Feb 06

steps_banner.jpg (8224 bytes)

Backmove.gif (1900 bytes)Ahead

Main Deck:

 


  Now place the main deck (D2) into place, the tops D12 D15 should form a shelf under hatch 03 as shown on SIDE 2 "View on Inside of Port Bulwark".

  The front edge of D2 should rest halfway over D18. Now glue D2 into place onto the supports strips, D12, D15 & D18 (this job is best done with a slow setting styrene adhesive, as you would get in a tube of cement.)

  Then from DC-2 cut out D10, gently trim and sand until it fits into the bow section. Glue into place onto the front half of D18 and 238's, leave aside to dry thoroughly.

Roger's Notes: When I glued the deck into position, I slid the pins into the holes to hold the deck. 


          Click on image to enlarge


          Click on image to enlarge


          Click on image to enlarge
 


          Click on image to enlarge


          Click on image to enlarge


          Click on image to enlarge
 

  After the glue had dried, I removed the pins and filled the holes with filler.


          Click on image to enlarge
 


 

Model Marina Web Site © Copyright 2006 RKTMAN  All rights reserved.
Web site Designed & Maintained By RKTMAN

Dumas Logo and materials Copyright Dumas Products, Inc. - Used with permission.
Model Slipway Logo and materials Copyright Model Slipway - Used with permission.
Midwest Logo and materials Copyright Midwest Products, Inc. - Used with permission.
Harbor Models graphics and materials Copyright  Harbor Models  - Used with permission.