After the yellow had dried I painted the black and silver on the rams. This was not as hard as I thought it would be with them already glued to the booms. I also painted the ram I did not apply to the main boom. It was even easier to paint... (Dah) then glued it to the main boom and glued together the booms. Next came adding the hydraulic hoses to the crane. A coil of hose came with the kit... plenty of it! It's good to have a little extra for those repairs in the future. I started to add the hoses. I first dipped the hose in CA and then slid then onto the hydraulic pipes. Close-up of the hoses. Almost done with the hoses! close-up view of the pivot ram. Here is the pivot ram with the hydraulic hoses. Now I am really close to being done.
|
Last entries
Another year has passed!
Time to start work again? USS Spruance Superstructure USS Spruance Superstructure USS Spruance Superstructure USS Spruance Superstructure USS Spruance Superstructure Building the ATLAS 5-Ton Hydraulic Deck Crane Building the ATLAS 5-Ton Hydraulic Deck Crane uilding the ATLAS 5-Ton Hydraulic Deck Crane Last Comments
3 user(s) viewing
3 guest(s)
0 member(s) 0 anonymous member(s) Search My Blog
Categories
My Blog Links
|