  
Cement E-3 to E-1/2.
  
Cement both E-4's to the top of E-3
and E-2.
  
Block sand the funnel frame work then plank
with balsa strips (1/8 x 1/4). Note that the planks must be tapered to lay properly on the
frame. It is best to start planking with a plank capping each end of E-2 and E-3, then
fill in the remaining spaces with tapered planks.

  
Trace the top of the planked funnel on to the
¼" balsa provided. Cut out the cap and cement in place. Sand the cap to the shape
shown in the drawing. |
 |

Roger's Notes: Parts are traced and cut out.

Roger's Notes: The four pices are pinned
together and sanded to shape.

Roger's Notes: The small funnels are shaved then
sanded to shape.
|